It’s finished…..
We are very pleased with the fit and finish of the new bathroom.
◄ Back Next ► Picture 1 of 5
|
||||
|
It’s finished….. We are very pleased with the fit and finish of the new bathroom. ◄ Back Next ► Picture 1 of 5 Work got under way in early November to pull our bathroom apart and rebuild it totally. We’d decided to rearrange the room so that the layout could include a separate shower enclosure as well as a bath and a pair of basins and more storage. The cupboard which was in the bathroom has been reversed . . . → Read More: Bathroom refurbishment The Pool has now been back filled and the ground levels corrected and the edges concreted. ◄ Back Next ► Picture 1 of 13 |
||||
|
Copyright © 2012 Temps Perdu – Croix De Chambre - All Rights Reserved. Site hosted by Webfaction Powered by WordPress & Atahualpa |
||||